A modular loft conversion replaces your roof with a factory-built top floor. The old roof comes off in the morning, the new storey is lowered on in sections, and the house is watertight again by evening. The same method builds a prefab loft extension over a bungalow or a rooftop extension on a flat-roofed house.

Get a quote

House open to the sky
Usually one day
Permitted development volume
40 or 50 m³
Building regulations
Always needed

Houses it suits, and houses it does not

  • Low or shallow roofs. Where the ridge is too low to stand under, a conventional conversion cannot make a room. A new roof module can, because it brings its own height, subject to planning.
  • Bungalows and chalet houses. A simple rectangular plan with load-bearing outer walls takes a new storey most easily.
  • Streets a large crane can enter. Roof sections are long, and they are lifted higher and further than a garden room. Access decides this job more than any other.
  • Not most mid-terraces. Party walls on both sides, chimneys shared with neighbours and nowhere to stand a crane make a traditional dormer the better answer.

The planning routes in England

RouteWhat it allows
Permitted development, terraced houseNo applicationUp to 40 m³ of added roof space, no higher than the existing ridge
Permitted development, semi or detachedNo applicationUp to 50 m³, no higher than the existing ridge
Extra storey by prior approvalCouncil has 8 weeksOne or two new storeys on houses built between July 1948 and October 2018
Householder planning application£548 in 2026Anything else, including a raised ridge and all work in conservation areas
Where these figures come from

Limits are from the government's technical guidance on householder permitted development and the Planning Portal's loft conversion pages. The application fee is from English council fee schedules for 2026. Wales and Scotland set their own rules and fees, and Scotland also requires a building warrant.

Try the cost calculator

How a roof is swapped in a day

The work before lift day is quiet. An engineer checks that the walls and foundations can carry another floor. Scaffolding goes up. Inside, the loft is cleared, tanks and wiring are moved and a temporary deck is laid over the ceiling joists. Meanwhile the factory builds the new storey as two to four sections, each small enough for a lorry, with dormers, windows, insulation and often the plasterboard already in place.

On the day, roofers strip the tiles and cut out the old timbers, the crane lowers a new floor structure onto the wall plates, then each roof section in turn. Joints are sealed and the outer covering is finished over the next few days. The stair, the bathroom and the decoration follow from inside, which takes a further four to eight weeks.

The risk is rain between old roof off and new roof on. A good firm watches the forecast, keeps sheeting ready and will postpone a lift sooner than gamble. Ask what happens to your ceilings and your costs if they call it off.

Modular loft or traditional dormer

A traditional dormer conversion is built in place by carpenters over six to ten weeks, mostly from scaffolding, with the roof opened a part at a time. It needs no crane and suits almost any street. It works with the roof you have, so if the ridge is low the rooms are low.

A modular conversion costs more to set up, because of the crane, the engineering and the transport, and saves time and weather exposure. It comes into its own where the old roof is not worth keeping: too shallow, in poor repair, or on a bungalow that needs a full new floor. If your existing loft already has good headroom, a dormer built in place is usually the cheaper choice.

What a rooftop extension is

A modular rooftop extension adds a full storey with vertical walls, most often on a flat-roofed or post-war house, sometimes on a block of flats. Since 2020 many houses in England can add one or two storeys through a prior approval process instead of a full planning application. The council still looks at the outside appearance, the effect on neighbours and a few other matters, and can refuse.

The house must have been built between 1 July 1948 and 28 October 2018, must not be in a conservation area, and the new height must stay within set limits compared with its neighbours. Because the added weight is large, the structural check comes first; there is no point drawing a storey the foundations cannot hold.

Fire, stairs and the rules that reshape the house below

Turning a two-storey house into three changes how building regulations treat the whole of it. The stair from the new floor must lead to an outside door through a protected route, which in practice means fire doors to the rooms off the hall and landing, and mains-wired, linked smoke alarms on every level. Open-plan ground floors often need a sprinkler or a second way out.

The new stair needs two metres of headroom, eased slightly where it runs under a slope, and somewhere to land on the floor below. That usually costs part of a bedroom. Settle the stair position before anything else: it decides the layout upstairs and down.

Semi-detached and terraced owners in England and Wales also have the Party Wall Act to follow. Resting new beams on the shared wall, or raising it, calls for two months' written notice to the neighbour.

What it costs

We do not show a price per square metre for roof-level modules, because there is no national figure we would stand behind. What can be said is this. A conventional dormer conversion typically costs £40,000 to £65,000 outside London and £60,000 to £90,000 in London, including VAT, before any bathroom fit-out. A craned-in conversion carries the same finishing costs plus a larger crane than a garden lift, a road closure in many streets, and heavier engineering.

Three things move the figure most: the size of crane the street forces on the job, whether the stair fits without rebuilding rooms below, and how much of the floor structure is new. Quotes for the same house can differ by a third, so compare what each includes line by line.

Sources for this page

From survey to sleeping up there

  1. Structure first

    An engineer confirms the walls and foundations can take the load, and the stair position is fixed.

  2. Approvals and factory

    Planning or prior approval, building control and party wall notices run while the sections are made.

  3. Lift day

    Old roof off, new floor and roof sections craned on, joints sealed. You will be asked to be out for the day.

  4. Fit-out

    Stair, electrics, plumbing and decoration from inside, with the scaffolding down early.

Common questions

How long does a modular loft conversion take?

Design and approvals take two to four months. The factory needs about six weeks. At the house, allow a week of preparation, one day for the lift and four to eight weeks to fit the stair and finish the rooms.

Do I have to move out?

For lift day, yes: nobody may be in a house while loads are lifted over it. Many families also stay elsewhere for the week the stair goes in. The rest of the time you can live at home.

Do I need planning permission for a prefab loft conversion?

Not always. Within the 40 or 50 m³ volume limit, below the existing ridge, and clear of the front roof slope, a loft conversion can be permitted development. Raising the ridge, which many modular designs do, needs an application or prior approval. The Planning Portal lists every condition.

Can a modular loft go on a terraced house?

It can, on an end terrace or where a rear lane gives a crane room to work. On a mid-terrace in a narrow street the lift is often impractical, and a conversion built in place is the sensible route.

Is a rooftop extension the same as a loft conversion?

No. A loft conversion makes rooms within or just beyond the roof shape. A rooftop extension adds a whole new storey with full-height walls and a new roof above it, and it goes through a different planning route.

Will my foundations cope with another floor?

Many do, because a timber-framed storey is light compared with the masonry below it. Nobody can say without checking. Trial holes beside the walls and an engineer’s calculation settle it, and building control will want to see both.

More on this site

Get a quote for a loft or rooftop module

Three short steps, about a minute. Start with the postcode so we know which firms can reach you.

This is a free introduction service, not a modular extension firm. We look for a firm that builds this type of extension where you live and tell you its name. Your details go to that firm only when you say yes.

Step 1 of 3

Where is the house?
Get a quote